(NOTE: This page needs to be moved to the BNL switchyard, to be covered by 'https'...)



  • Run03 task force report
  • Shift sign-up form
  • Run03 page

  • online_monitoring
  • mail1
  • mail2
  • haggerty: howtowritecode.txt
  • mail, worth recalling, about RHIC's GPM X-term
  • Machine luminosity parameters update
  • -- The PDF file mentioned in the previous E-mail
  • Esumi shinichi (esumi@sakura.cc.tsukuba.ac.jp):   very simple root event display
  • Jeff Mitchell's event display page
  • PHENIX acronyms (updated!)
  • ERT Trigger Meeting Notes (1/14/03)
  • Draft d-Au run plan
  • DAQ Tutorial!
  • Temporary additional instructions for daq operators
  • Bill: "Run status, backgrounds, and additional measurements"
  • Matthias: " update on \Int L dt"
  • Mike Leitch's E-mail about the new South Mu-ID shield wall.
  • LVL2 status report (.ppt, .ps, and .pdf versions referenced)
  • Atsushi's MUID chamber current plot


  • Time periods:  ( PHENIX/listservers/dc:1083 )
    
      a) commissioning 11/18-12/03
                       12/03-12/18
                       12/19-01/02
    
      b) physics run   1/3 -1/14
                       1/15-1/23
                       1/24-2/11
                       2/12-2/25
                       2/26-3/11
                       3/12-3/25
                       3/26-4/8
                       4/9 -4/22
                       4/23-5/5
                       5/7 -5/20